Guide · What to expect

The roof replacement process, step by step

Never had a roof replaced? Here's what happens from the first phone call to the final clean-up, and what you need to do along the way.

  1. 1. Phone call and booking

    Tell us about the roof: age, material, any leaks, and whether you're near the coast. We book a time to look.

  2. 2. On-site inspection

    We measure every roof face and check the sheet or tiles, flashings, gutters and battens. Where we can, we look inside the roof space. If asbestos is suspected, we arrange testing.

  3. 3. Written quote

    An itemised quote with steel type, profile, colour, sarking, batten allowance, gutters, extras and a timeframe. Work over $5,000 comes with a written NSW home building contract.

  4. 4. Approvals and scheduling

    If you're in a heritage conservation area, we sort out the council side first. We order materials in your chosen colour and lock in a start date that works around the weather forecast.

  5. 5. Set-up

    Scaffolding or edge protection goes up and a skip arrives. We'll ask you to move cars and anything fragile away from the walls.

  6. 6. Strip-off, one section at a time

    Old roofing comes off in sections so the house is never left open overnight. Asbestos removal is handled separately by a licensed removalist.

  7. 7. Battens, sarking and sheeting

    Damaged battens are replaced and sarking or an insulation blanket goes down. New sheets are then fixed to the manufacturer's spec for your wind rating, followed by flashings and ridge capping.

  8. 8. Gutters, downpipes and extras

    New gutters and downpipes, then skylights, vents and solar going back on.

  9. 9. Clean-up and walk-through

    We do a magnetic sweep for screws and offcuts, clear the gutters and walk the job with you. You get warranty paperwork and the product information for your records.

What it looks like on site

Roofer tossing old roof tiles down during a tile-to-metal conversionRoofer working on a tiled roof beside a bundle of removed tilesDrone view mid-job: old tiles half stripped while new dark metal sheets go onRoofer lifting a new corrugated sheet onto the roof from scaffoldingRoofer cutting a metal roof sheet to size on the lawnTwo roofers working on a tile roof among the trees

Frequently asked questions

Can I stay home during a roof replacement?

Yes. Most people stay put. It's noisy during the day, and you'll need to keep kids and pets clear of the work area, but the house stays covered every night.

What happens if it rains mid-job?

We watch the forecast and only open as much roof as we can close the same day. If rain comes in unexpectedly, exposed sections are covered straight away.

Sources

Figures and rules on this page come from the following. Prices are market ranges, not our quotes; your written quote is fixed.

  1. NSW Government — Contracts for residential building work
  2. State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
  3. NSW Government — Unlicensed asbestos removal (10 m² rule)

More guides

Call now Free quote